














Analysis of existing floor plate planning inefficiencies led to an infill of "pavilion" amenity space.

which provided both increased planning flexibility on the horizontal plate while establishing the ability for tenants to have embedded interior vertical connection.


info
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·

















